A stadium hosting an international tournament must satisfy requirements written by the organiser rather than by the local club that will inherit it. Many of those requirements concern television.
Camera positions are designed into the structure
The main camera platform must sit at a specified height and angle relative to the halfway line, and that geometry has to be built into the stand rather than added later.
Additional platforms behind each goal, at pitch level and in the corners are also specified, each requiring structural support, access and cable routes.
Retrofitting these into an existing stand is expensive and often compromises seating, which is why hosting requirements drive so many new builds rather than renovations.
Lighting is specified for cameras, not spectators
Broadcast requires far higher and more uniform illumination than a crowd needs, measured towards each camera position rather than simply downward onto the pitch.
Flicker becomes critical because super-slow-motion replay exposes fluctuations invisible to the eye, so lighting must be stable at high frame rates.
Meeting the standard affects the roof structure, the electrical supply and the venue's running costs permanently, long after the tournament has moved on.
Media space is a substantial part of the footprint
Requirements cover commentary positions, mixed zones, press conference rooms, an on-site broadcast compound and dedicated parking for outside broadcast vehicles.
The compound alone occupies a large area beside the stadium with its own power, connectivity and security perimeter, and it must be accessible to heavy vehicles.
Much of this space has no ordinary use, which is one source of the underused capacity that host stadiums carry after the event.
Connectivity requirements have grown fastest
Modern specifications demand fibre capacity capable of carrying many simultaneous high-bandwidth feeds off site, with diverse routing so a single cable failure cannot black out a match.
Spectator connectivity is specified separately, since a full stadium generates enormous demand and organisers require that it does not degrade operational systems.
These provisions are invisible in photographs of a finished venue but represent a meaningful share of its cost.
Clean venue rules override the building's identity
During the tournament the stadium's own sponsors, naming rights and club branding are covered or removed so only the organiser's partners appear.
That obligation is agreed years ahead and can conflict with the venue's existing commercial contracts, which is why hosting agreements require those contracts to permit suspension.
The building effectively becomes a neutral shell for the duration, which is the clearest sign that the specification was written for an event rather than for the venue's own life.